27 C
Port Louis
Saturday, April 27, 2024

Download The App:

Read in French

spot_img

TAG

Single Line Operation

Metro Express : Single Line Operation From Beau Bassin To Rose-Hill As From 15 August

In the context of integration works of Phase 3 undertaken by the Metro Express Ltd (MEL) connecting Rose-Hill to Ebène to Réduit, a single...
- Advertisement -spot_img

Latest news